← All StatesWisconsin Construction
WI — Stormwater Compliance
Wisconsin Construction
Stormwater Inspections
Wisconsin's WPDES Construction Site Storm Water Runoff General Permit WI-S067831-6 is administered by the Wisconsin Department of Natural Resources. The permit features automatic coverage 14 days after a complete NOI submission. Wisconsin's seasonal construction challenges, spring snowmelt, and extensive lake and river systems require diligent erosion and sediment control throughout the construction process.
Permit Details
Permit Designation
WI-S067831-6
Issuing Authority
Wisconsin Department of Natural Resources
Key Inspection Requirements
✓Erosion and sediment controls must be routinely inspected at least every 7 days
✓NOI must be submitted at least 14 working days before land-disturbing activities begin
✓SWPPP required per Wisconsin NR 216 storm water discharge permit program requirements
✓Automatic coverage 14 working days after DNR receives a complete application
✓NOT required after construction is completed and site is fully stabilized
How StormGuard Pro Helps in Wisconsin
- Auto-generates PDF inspection reports matched to the WI-S067831-6 template
- AI-powered photo analysis identifies 17+ BMP types during field inspections
- Tracks 7-day precipitation and triggers post-storm inspection alerts automatically
- Corrective action tracking with deadline reminders per WI permit requirements
- Shareable report links for project owners, regulators, and the Wisconsin Department of Natural Resources
Ready to Simplify WI Inspections?
See how StormGuard Pro handles Wisconsin construction stormwater compliance with a free demo.
Request a Demo →Start Your Wisconsin Stormwater Inspections Today
Join contractors and consultants across Wisconsin using StormGuard Pro to stay compliant with WI-S067831-6 requirements.
Request a Free Demo →