StormGuardPRO
← All States
AR — Stormwater Compliance

Arkansas Construction Stormwater Inspections

Arkansas's Construction General Permit ARR150000 covers stormwater discharges from construction activities disturbing one or more acres. Administered by the Arkansas Division of Environmental Quality, the permit emphasizes sediment basin requirements and routine BMP inspections. Operators must maintain a current SWPPP on-site and comply with all effluent limitations.

Permit Details

Permit Designation
ARR150000
Issuing Authority
Arkansas Department of Energy and Environment - Division of Environmental Quality

Key Inspection Requirements

SWPPP required before construction activity begins
Site inspections at least every 7 days and within 24 hours of a 0.5-inch rain event
Sediment basins required for drainage areas of 10 or more acres
Final stabilization required before Notice of Termination
Corrective actions must be completed within 7 days of discovering deficiencies

How StormGuard Pro Helps in Arkansas

  • Auto-generates PDF inspection reports matched to the ARR150000 template
  • AI-powered photo analysis identifies 17+ BMP types during field inspections
  • Tracks 7-day precipitation and triggers post-storm inspection alerts automatically
  • Corrective action tracking with deadline reminders per AR permit requirements
  • Shareable report links for project owners, regulators, and the Arkansas Department of Energy and Environment - Division of Environmental Quality

Ready to Simplify AR Inspections?

See how StormGuard Pro handles Arkansas construction stormwater compliance with a free demo.

Request a Demo →

Start Your Arkansas Stormwater Inspections Today

Join contractors and consultants across Arkansas using StormGuard Pro to stay compliant with ARR150000 requirements.

Request a Free Demo →