SD — Stormwater Compliance

South Dakota Construction Stormwater Inspections

South Dakota's General Permit SDR100000 for stormwater discharges from construction activities is administered by the Department of Agriculture and Natural Resources. The permit requires online NOI submission through the EPA CDX portal and SWPPP development prior to construction. South Dakota's extreme temperature swings, wind erosion on the plains, and spring snowmelt require adaptive stormwater management approaches.

Permit Details

Permit Designation
SDR100000
Issuing Authority
South Dakota Department of Agriculture and Natural Resources

Key Inspection Requirements

SWPPP required before submitting NOI
NOI must be submitted at least 15 days before construction commences
Inspections every 7 days and within 24 hours of a 0.5-inch or greater rain event
Electronic NOI submission through EPA CDX portal
Annual tiered fees based on disturbed acreage

How StormGuard Pro Helps in South Dakota

  • Auto-generates PDF inspection reports matched to the SDR100000 template
  • AI-powered photo analysis identifies 17+ BMP types during field inspections
  • Tracks 7-day precipitation and triggers post-storm inspection alerts automatically
  • Corrective action tracking with deadline reminders per SD permit requirements
  • Shareable report links for project owners, regulators, and the South Dakota Department of Agriculture and Natural Resources

Ready to Simplify SD Inspections?

See how StormGuard Pro handles South Dakota construction stormwater compliance with a free demo.

Request a Demo →

Start Your South Dakota Stormwater Inspections Today

Join contractors and consultants across South Dakota using StormGuard Pro to stay compliant with SDR100000 requirements.

Request a Free Demo →