StormGuardPRO
← All States
PA — Stormwater Compliance

Pennsylvania Construction Stormwater Inspections

Pennsylvania's PAG-02 General NPDES Permit covers stormwater discharges from construction activities disturbing one or more acres. Administered by PA DEP under Chapter 102 regulations, the permit requires both erosion and sediment control and post-construction stormwater management plans. The permit became effective December 2024 with a 60-day advance NOI submittal requirement.

Permit Details

Permit Designation
PAG-02
Issuing Authority
Pennsylvania Department of Environmental Protection

Key Inspection Requirements

Erosion and Sediment Control Plan and PCSM (Post-Construction Stormwater Management) Plan required
NOI must be submitted at least 60 days before commencing earth disturbance
Inspections every 7 days and within 24 hours of a 0.5-inch or greater rainfall event
Chapter 102 compliance for erosion and sediment control measures
PCSM BMPs required for long-term stormwater management after construction

How StormGuard Pro Helps in Pennsylvania

  • Auto-generates PDF inspection reports matched to the PAG-02 template
  • AI-powered photo analysis identifies 17+ BMP types during field inspections
  • Tracks 7-day precipitation and triggers post-storm inspection alerts automatically
  • Corrective action tracking with deadline reminders per PA permit requirements
  • Shareable report links for project owners, regulators, and the Pennsylvania Department of Environmental Protection

Ready to Simplify PA Inspections?

See how StormGuard Pro handles Pennsylvania construction stormwater compliance with a free demo.

Request a Demo →

Start Your Pennsylvania Stormwater Inspections Today

Join contractors and consultants across Pennsylvania using StormGuard Pro to stay compliant with PAG-02 requirements.

Request a Free Demo →