← All StatesNorth Dakota Construction
ND — Stormwater Compliance
North Dakota Construction
Stormwater Inspections
North Dakota's NDPDES Permit NDR10-0000 for stormwater discharges from construction activities is administered by the North Dakota Department of Environmental Quality. The permit covers approximately 4,000 active construction projects across the state. North Dakota's harsh winters, spring snowmelt, and wind-driven erosion on exposed soils create unique challenges for year-round construction stormwater compliance.
Permit Details
Permit Designation
NDR10-0000
Issuing Authority
North Dakota Department of Environmental Quality
Key Inspection Requirements
✓SWPPP required before construction begins
✓Inspections every 7 days and within 24 hours of a 0.5-inch or greater rainfall event
✓Final stabilization required with uniform perennial vegetative cover
✓SWPPP must be kept on-site or at a readily available location
✓NOT required upon achieving final stabilization across all disturbed areas
How StormGuard Pro Helps in North Dakota
- Auto-generates PDF inspection reports matched to the NDR10-0000 template
- AI-powered photo analysis identifies 17+ BMP types during field inspections
- Tracks 7-day precipitation and triggers post-storm inspection alerts automatically
- Corrective action tracking with deadline reminders per ND permit requirements
- Shareable report links for project owners, regulators, and the North Dakota Department of Environmental Quality
Ready to Simplify ND Inspections?
See how StormGuard Pro handles North Dakota construction stormwater compliance with a free demo.
Request a Demo →Start Your North Dakota Stormwater Inspections Today
Join contractors and consultants across North Dakota using StormGuard Pro to stay compliant with NDR10-0000 requirements.
Request a Free Demo →