NH — Stormwater Compliance

New Hampshire Construction Stormwater Inspections

New Hampshire is covered by EPA's federal Construction General Permit as the state has not assumed NPDES authority. EPA Region 1 administers the permit for construction activities disturbing one or more acres. Projects must also comply with New Hampshire's Alteration of Terrain program for sites disturbing 100,000 square feet or more, creating dual regulatory requirements.

Permit Details

Permit Designation
EPA Construction General Permit (CGP)
Issuing Authority
U.S. Environmental Protection Agency - Region 1

Key Inspection Requirements

SWPPP required before NOI submission to EPA
Inspections every 7 days and within 24 hours of a 0.5-inch or greater rainfall event
Compliance with New Hampshire Alteration of Terrain Program requirements
Endangered species and historic property screening required
Post-construction stormwater controls meeting state standards required

How StormGuard Pro Helps in New Hampshire

  • Auto-generates PDF inspection reports matched to the EPA Construction General Permit (CGP) template
  • AI-powered photo analysis identifies 17+ BMP types during field inspections
  • Tracks 7-day precipitation and triggers post-storm inspection alerts automatically
  • Corrective action tracking with deadline reminders per NH permit requirements
  • Shareable report links for project owners, regulators, and the U.S. Environmental Protection Agency - Region 1

Ready to Simplify NH Inspections?

See how StormGuard Pro handles New Hampshire construction stormwater compliance with a free demo.

Request a Demo →

Start Your New Hampshire Stormwater Inspections Today

Join contractors and consultants across New Hampshire using StormGuard Pro to stay compliant with EPA Construction General Permit (CGP) requirements.

Request a Free Demo →