StormGuardPRO
← All States
MS — Stormwater Compliance

Mississippi Construction Stormwater Inspections

Mississippi's Large Construction General Permit MSR10 is administered by the Mississippi Department of Environmental Quality for construction activities disturbing five or more acres. A separate small construction permit covers 1-5 acre sites. Mississippi's high rainfall intensity, erosive soils, and proximity to the Gulf Coast require comprehensive sediment and erosion control measures.

Permit Details

Permit Designation
MSR10
Issuing Authority
Mississippi Department of Environmental Quality

Key Inspection Requirements

SWPPP required before construction begins
Inspections every 7 days and within 24 hours of a 0.5-inch or greater storm event
Separate permits for large (5+ acres) and small (1-5 acres) construction
Sediment basins required for drainage areas of 10 or more disturbed acres
Final stabilization required before Certificate of Coverage can be terminated

How StormGuard Pro Helps in Mississippi

  • Auto-generates PDF inspection reports matched to the MSR10 template
  • AI-powered photo analysis identifies 17+ BMP types during field inspections
  • Tracks 7-day precipitation and triggers post-storm inspection alerts automatically
  • Corrective action tracking with deadline reminders per MS permit requirements
  • Shareable report links for project owners, regulators, and the Mississippi Department of Environmental Quality

Ready to Simplify MS Inspections?

See how StormGuard Pro handles Mississippi construction stormwater compliance with a free demo.

Request a Demo →

Start Your Mississippi Stormwater Inspections Today

Join contractors and consultants across Mississippi using StormGuard Pro to stay compliant with MSR10 requirements.

Request a Free Demo →