← All StatesMississippi Construction
MS — Stormwater Compliance
Mississippi Construction
Stormwater Inspections
Mississippi's Large Construction General Permit MSR10 is administered by the Mississippi Department of Environmental Quality for construction activities disturbing five or more acres. A separate small construction permit covers 1-5 acre sites. Mississippi's high rainfall intensity, erosive soils, and proximity to the Gulf Coast require comprehensive sediment and erosion control measures.
Permit Details
Permit Designation
MSR10
Issuing Authority
Mississippi Department of Environmental Quality
Key Inspection Requirements
✓SWPPP required before construction begins
✓Inspections every 7 days and within 24 hours of a 0.5-inch or greater storm event
✓Separate permits for large (5+ acres) and small (1-5 acres) construction
✓Sediment basins required for drainage areas of 10 or more disturbed acres
✓Final stabilization required before Certificate of Coverage can be terminated
How StormGuard Pro Helps in Mississippi
- Auto-generates PDF inspection reports matched to the MSR10 template
- AI-powered photo analysis identifies 17+ BMP types during field inspections
- Tracks 7-day precipitation and triggers post-storm inspection alerts automatically
- Corrective action tracking with deadline reminders per MS permit requirements
- Shareable report links for project owners, regulators, and the Mississippi Department of Environmental Quality
Ready to Simplify MS Inspections?
See how StormGuard Pro handles Mississippi construction stormwater compliance with a free demo.
Request a Demo →Start Your Mississippi Stormwater Inspections Today
Join contractors and consultants across Mississippi using StormGuard Pro to stay compliant with MSR10 requirements.
Request a Free Demo →