StormGuardPRO
← All States
IN — Stormwater Compliance

Indiana Construction Stormwater Inspections

Indiana's Construction Stormwater General Permit INR100000 is administered by IDEM and implements the state's Rule 5 requirements for construction sites disturbing one or more acres. The permit requires both construction-phase and post-construction stormwater controls. Indiana's clay-rich soils and frequent storm events make sediment management a primary compliance focus.

Permit Details

Permit Designation
INR100000
Issuing Authority
Indiana Department of Environmental Management

Key Inspection Requirements

SWPPP and associated BMP plan required before land disturbance
Inspections every 7 days and within 24 hours of a 0.5-inch or greater rainfall event
Rule 5 (327 IAC 15-5) erosion and sediment control requirements apply
Post-construction stormwater quality and quantity controls required
NOI must be submitted at least 48 hours before land disturbance begins

How StormGuard Pro Helps in Indiana

  • Auto-generates PDF inspection reports matched to the INR100000 template
  • AI-powered photo analysis identifies 17+ BMP types during field inspections
  • Tracks 7-day precipitation and triggers post-storm inspection alerts automatically
  • Corrective action tracking with deadline reminders per IN permit requirements
  • Shareable report links for project owners, regulators, and the Indiana Department of Environmental Management

Ready to Simplify IN Inspections?

See how StormGuard Pro handles Indiana construction stormwater compliance with a free demo.

Request a Demo →

Start Your Indiana Stormwater Inspections Today

Join contractors and consultants across Indiana using StormGuard Pro to stay compliant with INR100000 requirements.

Request a Free Demo →