← All StatesIdaho Construction
ID — Stormwater Compliance
Idaho Construction
Stormwater Inspections
Idaho's IPDES Construction General Permit IDR100000 is administered by the Idaho Department of Environmental Quality following delegation from EPA in 2021. The permit covers stormwater discharges from construction activities disturbing one or more acres. Idaho's mountainous terrain and sensitive salmon-bearing streams require special attention to sediment control and fish habitat protection.
Permit Details
Permit Designation
IDR100000
Issuing Authority
Idaho Department of Environmental Quality
Key Inspection Requirements
✓SWPPP required before construction activity begins
✓Inspections every 7 days and within 24 hours of a 0.5-inch or greater rainfall event
✓BMPs must be installed before ground disturbance commences
✓Final stabilization with uniform perennial vegetative cover of 70% of pre-disturbance levels
✓Corrective actions required within 7 days of identifying BMP deficiencies
How StormGuard Pro Helps in Idaho
- Auto-generates PDF inspection reports matched to the IDR100000 template
- AI-powered photo analysis identifies 17+ BMP types during field inspections
- Tracks 7-day precipitation and triggers post-storm inspection alerts automatically
- Corrective action tracking with deadline reminders per ID permit requirements
- Shareable report links for project owners, regulators, and the Idaho Department of Environmental Quality
Ready to Simplify ID Inspections?
See how StormGuard Pro handles Idaho construction stormwater compliance with a free demo.
Request a Demo →Start Your Idaho Stormwater Inspections Today
Join contractors and consultants across Idaho using StormGuard Pro to stay compliant with IDR100000 requirements.
Request a Free Demo →