← All StatesGeorgia Construction
GA — Stormwater Compliance
Georgia Construction
Stormwater Inspections
Georgia's Construction Stormwater General Permit GAR100001 is administered by the Georgia Environmental Protection Division and covers construction activities disturbing one or more acres. The permit works alongside Georgia's Erosion and Sedimentation Act requirements. Georgia's red clay soils and high-intensity storm events make erosion control particularly critical during construction activities.
Permit Details
Permit Designation
GAR100001
Issuing Authority
Georgia Environmental Protection Division
Key Inspection Requirements
✓Erosion, Sedimentation, and Pollution Control Plan required before land disturbance
✓Inspections required every 7 days and within 24 hours of a rain event of 0.5 inches or more
✓Primary and secondary BMPs required for all disturbed areas
✓Buffer zone requirements for state waters and wetlands
✓Electronic submittal of NOI through Georgia EPD Online System (GEOS)
How StormGuard Pro Helps in Georgia
- Auto-generates PDF inspection reports matched to the GAR100001 template
- AI-powered photo analysis identifies 17+ BMP types during field inspections
- Tracks 7-day precipitation and triggers post-storm inspection alerts automatically
- Corrective action tracking with deadline reminders per GA permit requirements
- Shareable report links for project owners, regulators, and the Georgia Environmental Protection Division
Ready to Simplify GA Inspections?
See how StormGuard Pro handles Georgia construction stormwater compliance with a free demo.
Request a Demo →Start Your Georgia Stormwater Inspections Today
Join contractors and consultants across Georgia using StormGuard Pro to stay compliant with GAR100001 requirements.
Request a Free Demo →